Traineeship Component Aim Achievement Rates in PICSWeb QAR Calculations
Traineeship Component Aim Achievement Rates are limited to Traineeship component aims with the following criteria:
Aim Type is not 1
Programme Type = 24
The aim is not Excluded from Achievement Rates.
Overall Achievement Rates
The Traineeship Component Aim overall achievement rates are calculated using the standard Overall methodology and includes component aims where the Actual End date is not blank. There is no requirement for a positive outcome in the component aims report, unlike the Traineeship Programmes report, nor is the hybrid end date affected by the Outcome Start date.
Timely Achievement Rates
The Traineeship Component Aim timely achievement rates are calculated using the standard Timely Methodology and include component aims where the Planned End date is before the end of the PICSWeb Report period.
Calculation Summaries
Traineeship Component Aim Year Cohorts
A. Overall achievement |
|
B. Timely achievement |
|
Traineeship Component Aim Achievements
Note that any of the calculations below may be affected by the report options.
Cohort | Aims from A or B above. | Maximum/Minimum Overall achievement. See details of the Extended Cohort used in these figures. |
Achieved | Aims in Cohort where: Outcome status = 1; Â And (for Timely Success only) the AED is <= 90 days after the PED. | Maximum Overall achievement. All additional aims in the extended cohort are counted as achieved. Minimum Overall achievement. No additional aims in the extended cohort are counted as achieved. |
Achievement Rate | Achieved  x 100 |  |
 Other output calculations available for Table Type = Achievement, Retention and Pass rate
Completed | Aims in Cohort with Completion status = 2 | Â |
Retention Rate | Completed x 100 |  |
Pass Rate | Achieved   x 100 |  |
For more information, see the details of Excluded Aims and ILR Codes used in QAR.