Education and Training Achievement Rates in PICSWeb QAR Calculations

Education and Training Achievement Rates are limited to component aims which are not on an explicit programme. This includes any aim where:

Overall Achievement Rates

The Education and Training overall achievement rates are calculated using the standard Overall methodology and includes component aims where the Actual End date is not blank.

Timely Achievement Rates

The Education and Training timely achievement rates are calculated using the standard Timely methodology and include component aims where the Planned End date is before the end of the PICSWeb Report period.

Calculation Summaries

E&T Component Aim Year Cohorts

A. Overall achievement

  1. Aim Type not= 1 or 3

  2. Aim Programme Type not= 2, 3, 20-25

  3. Aim Funding Model not= 10, 70

  4. Aim Actual End Date (AED) is not blank.

  5. And the aim hybrid end date is in the year reported
    And is before the end of the PICSWeb report period.

B. Timely achievement

  1. Points 1-4 as for Overall.

  2. Aim Planned End Date (PED) is in the year reported
    And is before the end of the PICSWeb report period.

For more information, see the details of Excluded Aims and ILR Codes used in QAR.

E&T Component Aim Achievements

Note that any of the calculations below may be affected by the report options.

Cohort

Aims from A or B above.

Maximum/Minimum Overall achievement. See details of the extended cohort used in these figures.

Achieved

Aims in Cohort where:

Outcome Status = 1;

 

And (for Timely Success only) the AED is <= 90 days after the PED.

Maximum Overall achievement. All additional aims in the extended cohort are counted as achieved.

Minimum Overall achievement. No additional aims in the extended cohort are counted as achieved.

Achievement Rate

Achieved   x 100
 Cohort

 

Other output calculations available for Table Type = Achievement, Retention and Pass rate

Completed

Aims in Cohort with Completion Status = 2

 

Retention Rate

Completed  x 100
   Cohort

 

Pass Rate

  Achieved   x 100
Completed