Traineeship Component Aim Achievement Rates are limited to Traineeship component aims with the following criteria:

Overall Achievement Rates

The Traineeship Component Aim overall achievement rates are calculated using the standard Overall methodology and includes component aims where the Actual End date is not blank. There is no requirement for a positive outcome in the component aims report, unlike the Traineeship Programmes report, nor is the hybrid end date affected by the Outcome Start date.

Timely Achievement Rates

The Traineeship Component Aim timely achievement rates are calculated using the standard Timely methodologyMethodology and include component aims where the Planned End date is before the end of the PICSWeb Report period.

Calculation Summaries

Traineeship

...

Component Aim Year Cohorts

A. Overall achievement

  1. Aim type not= 1

  2. Aim programme type = 24

  3. Aim actual end date (AED) is not blank.

  4. And the aim hybrid end date Hybrid End Date is in the year reported
    And is before the end of the PICSWeb report period.

B. Timely achievement

  1. Points 1-3 as for Overall.

  2. Aim planned end date (PED) is in the year reported
    And is before the end of the PICSWeb report period.

Traineeship

...

Component Aim Achievements

Info

Note that any of the calculations below may be affected by the report options.

Cohort

Aims from A or B above.

Maximum/Minimum Overall achievement. See details of the extended cohort Extended Cohort used in these figures.

Achieved

Aims in Cohort where:

Outcome status = 1;

And (for Timely Success only) the AED is <= 90 days after the PED.

Maximum Overall achievement. All additional aims in the extended cohort are counted as achieved.

Minimum Overall achievement. No additional aims in the extended cohort are counted as achieved.

Achievement Rate

Achieved   x 100
 Cohort

...

Completed

Aims in Cohort with Completion status = 2

Retention Rate

Completed  x 100
   Cohort

Pass Rate

  Achieved   x 100
Completed

...

For more information, see the details of Excluded Aims and ILR Codes used in QAR.