Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Expand
titleOn This Page
Table of Contents

Education and Training Achievement Rates are limited to component aims which are not on an explicit programme. This includes any aim where:

Overall Achievement Rates

The Education and Training overall achievement rates are calculated using the standard Overall methodology and includes component aims where the Actual End date is not blank.

Timely Achievement Rates

The Education and Training timely achievement rates are calculated using the standard Timely methodology and include component aims where the Planned End date is before the end of the PICSWeb Report period.

Calculation Summaries

E&T Component Aim Year Cohorts

A. Overall achievement

  1. Aim type Type not= 1 or 3

  2. Aim programme type Programme Type not= 2, 3, 10, 20-25

  3. Aim Funding Model not= 10, 70

  4. Aim actual end date Actual End Date (AED) is not blank.

  5. And the aim hybrid end date is in the year reported
    And is before the end of the PICSWeb report period.

B. Timely achievement

  1. Points 1-3 4 as for Overall.

  2. Aim planned end date Planned End Date (PED) is in the year reported
    And is before the end of the PICSWeb report period.

...

For more information, see the details of Excluded Aims and ILR Codes used in QAR.

E&T

...

Component Aim Achievements

Info

Note that any of the calculations below may be affected by the report options.

Cohort

Aims from A or B above.

Maximum/Minimum Overall achievement. See details of the extended cohort used in these figures.

Achieved

Aims in Cohort where:

Outcome status Status = 1;

And (for Timely Success only) the AED is <= 90 days after the PED.

Maximum Overall achievement. All additional aims in the extended cohort are counted as achieved.

Minimum Overall achievement. No additional aims in the extended cohort are counted as achieved.

Achievement Rate

Achieved   x 100
 Cohort

...

Other output calculations available for Table Type = Achievement, Retention and Pass rate

Completed

Aims in Cohort with completion status Completion Status = 2

Retention Rate

Completed  x 100
   Cohort

Pass Rate

  Achieved   x 100
Completed

...