This page lists some of the recent changes to PICS. We also have a list of known issues being investigated.
...
Expand | ||
---|---|---|
| ||
Appointments
Courses
Generic
|
8th September
Webforms
Using a links to complete a web form, sign a review, or complete a survey could result in an error about an Invalid Token. Now fixed.
...
Cancelling the report options screen could be a touch on the slow side, so we’ve speeded it up.
Generic
Starting a trial licence, such as the Apprenticeship Accountability Framework Dashboard, could take an hour for the trial to kick in. These will now start immediately.
...
If a custom theme with a dark background was used on a sign up form, the password capture could be difficult to see. The password capture now handles this better.
Generic
Looking up the value of a provision of type ACE 360 Emp Sector could fail. Now fixed.
...
Cloning a workflow will now clone the default status and sub status from that source workflow.
Generic
We can now enable the Advanced Mosaic theme by default for all users upon request
HTML Editors would not allow a link to be added correctly. Now fixed.
Fields that are always required now have a visual * indicator next to their label.
...
It is now possible to generate a URL for an applicant signup form from with a course instance summary using the Actions menu.
Generic
All required edit fields on regular forms will now have a required field indicator on the label.
...
Reminder emails now have additional fields to merge, including description, and learner employer.
Generic
Phone numbers now support clicking on to use your chosen web based telephone system, such as Skype.
When adding a SOC provision to a record, you can now filter based on SOC level.
Access to specific File Types can now be restricted at user an user group level.
...
Skills Bootcamp calculations have been added to the Funding Calculator and Projected Funding.
It is now possible to reconcile Skills Bootcamp funding.
The Data Match reconciler was not always identifying the correct PICS Episode for a learner. Now fixed.
The App Monthly Payments reconciler’s option to perform Levy adjustments was setting the incorrect Claim Type of “N” for newly created Claim Items. Now Fixed.
Funding Forecasting
The Export now splits the Actual funding column into multiple columns identifying different Actuals funding types.
A new option “Include Optional Aims When Calculating Planned Starts Funding” has been added to the Setting screen to determine if optional Qualification Plan Qualifications are included in the forecasting calculations.
The “Planned In Learning” column was ambiguous as to its meaning, and has been removed from the profile tables. The Details view now shows Planned In Learning for a given period, along with the total Expected In Learning representing the Planned In Learning plus the Actual In Learning figures.
The Export now includes columns for Planned In Learning and Expected In Learning.
When forecasting funding for Qualification Plans the Source Of Funding is now only compulsory for AEB programmes and FM25 Traineeship programmes.
The ILR Exporter will no longer write Prior Attainment records dated after the latest aim start date being exported in that ILR file. This is to prevent PriorAttain_09 errors when future year ILR aims are added before the 2022 year end.
Generic
Our HTML editors have been extended to allow hyper links to be included in the text.
...
Trainee Assessors are not being included in the Edit Officer OneFile ID form. Now fixed.
Smart Assessor integration now has an option to push changes in qualification status up to Smart Assessor.
Reports
Important: Output of Postcode fields has been separated from general Address fields. We will be upgrading your stored reports to include this field if the Address field has been selected but please check the report outputs to ensure this has happened successfully.
...
A new report template, “User Sites Report” has been added which shows the Sites each user is linked to (or not).
Filtering by Status has been added to the User report.
Filtering by Site on the User report has been changed to allow “Any of”, “All of”, “None of” options - this will break existing stored reports that have selections in this filter - please check your reports if you have used this. At the time of writing there is 1 customer with 1 report.
...
The wording of whether a Learner, ILR Aim, Destination & Progression, or Workplace is included in the ILR has been standardised across data entry and reports. The variations of Export Status, Report in ILR etc. are now all referred to as ILR Export Status with options of Include in ILR Export or Withhold from ILR Export. This will need updating in existing reports and documents that use this field.
Ending a Break-in-Learning will now copy forward the HHS, DAMs, Subcontractor/Partner UKPRN and Learning Start Date Postcode where appropriate.
Actions that change a Learner’s Break-in-Learning status now refresh the whole page to ensure that the correct Start, Cancel, and/or End options are shown.
Learner Sex is now an optional for non-ILR Learners.
Learner Status filtering now includes an option for “In Learning and Last Year Leavers”.
The Learner Reference Number can now be set if there is not already an existing LRN for that learner. This only affects commercial learners who have been stored in PICS for several years, or where a new learning episode has been created for such a learner.
Editing the postcode on the ILR Learner Edit screen will now trigger a background update of postcode information.
Changes have been made to the ILR validation to reflect the ESFA Validation Rules version 5. These include:
New rules LearnDelFamType_108, Fworkcode_07, AchDate_12 and R133.
EmpId_13 (Employer ID cannot be 999999999) has been downgraded to a warning.
Minimum duration rules for Apprenticeship Standards (DateOfBirth_46 and DateOfBirth_47) are now applied.
...
Reports will now be aborted if they take more than 2 hours to run.
Reports are now limited to 200 optional fields.
For outputs linked to organisations, the following fields have been added to help report on the geographic spread of linked organisations: Ward, Ward Name, Region, and Local Authority.
Site filters in all reports are now multi select.
New Reports
A new report, Contracts Report, has been added to report against contracts.
A new report, ESF Contracting Report, has been added to report against ESF Supplementary Data.
Learner Report:
Performance improvements have been made to populating fields defined on the base Learner report.
Performance improvements have been made to populating UDF fields.
Filtering by Apprenticeship Service Status has been added.
Output of Age Band has been added to show the current Age Band.
Output of Programme SSA Tier 1 Title has been added.
Output Programme SSA Title has been renamed to Programme SSA Tier 2 Title. This will need updating in existing reports and documents that use this field.
Output of Source Applicant ID has been added.
Output of ILR EPA Organisation ID and Location have been added.
Output of the “Current LSF” field has been fixed. It was previously showing “Any LSF”.
Output of Start / End Reported Period fields has been added.
Learner Assessment Report
There were 2 fields name Title - for the Learner honorific and the Assessment Title - which could cause errors. The Assessment Title field has been renamed “Assessment Title”. This will need updating in existing reports and documents that use this field.
ILR Learner Report
Non ILR Funding Organisation can be included in this report - you must specify the Funding Organisations to include in the report options.
Filtering by ILR Employment Status has been added. This will return Learners that have any Employment records with the selected Statuses
Filtering by ILR Employment Monitoring has been added. This will return Learners that have any Employment Monitoring with any of the selected values.
Learner ILR Aims Report
Non ILR Funding Organisation can be included in this report - you must specify the Funding Organisations to include in the report options.
Non ILR Aims can be included in this report - you must specify the Aim Types to include in the report options.
Filtering by “Aim records added between dates” has been added.
Filtering by “Aim records with completion fields changed between dates” has been added. The fields are End Date, Completion Status, Learning Outcome, and Employment Outcome. Achieve date is also included on Programme Aims.
Output of EPA Organisation Location has been added.
Output of HE fields has been added.
Reviews Report
Output of Count of Attached Files has been added.
Change Request Report
Filtering by the Date the request was rejected has been added.
Output of the Date the request was rejected has been added.
Output of the User who rejected the request was has been added.
QAR Report
A new report type has been added: Apprenticeship Component Aims. This allows you to report across all apprenticeship component aims instead of just the programme aims. This is the equivalent of the “Report on comp aims (not prog aims)” option in desktop reports.
Completion, Retention and Pass totals and charts are now available for all report types, not just Education and Training reports. A new menu to select the type of table you wish to display has been added to allow this to be selected.
Achievement Rate forecasting (minimum and maximum rates) has been added to the QAR report. This will calculate a maximum learner total based on learners who are still in learning and could potentially still achieve, this is added to the existing achievement rate. Maximum rates assume that all of these learner will achieve, minimum rates assume that none of them will. A new menu to select the type of table you wish to display has been added to allow this to be selected. Any existing reports must be re-run to calculate the forecasting data.
New QAR reports will default to use the Interactive output mode. Existing saved reports are unaffected.
Output of Outcome Grade has been added. This is taken from the Main Aim for reports based on Programme Aims.
The QAR report can now be filtered by Site, Contract, UKPRN, or ILR Export Status for learners and aims.
The QAR dataset now includes a QAR Notes output which provides helpful notes when the overall year is modified due to events such as overdue planned breaks, or programme aims at EPA.
Learner Timeliness report. This is a new report which shows the time taken to enter key dates on a learner or aim, such as start, end, or achievement. It also includes changes to key dates to allow better monitoring of when these changes occur.
...